French (Fr)English (UK)

Trial E-SAFE

esafe-brochA successful trial has taken place where an old disused heavily contaminated oil well site was treated with plutus E-SAFE© and Bio8 microbes the combination of products rapidly and effectively removed     the high saturation of hydrocarbons present in the soil which will   eventually allow the company to return the successfully remediated land   to the owner without the need for expensive removal and disposal of hazardous contaminates. The process of analysis and ongoing evaluation   is still taking place. Look in latest news for updates and reports.

PRA oil well treatment

pra_brochTwo producing oil wells have been treated with Plutus PRA© to remove build ups of paraffin wax which was inhibiting oil flow. Early indications and data show an increase in production due to the reduced number of   hot water treatments needed since the application of PRA©. It also shows it has prevented any further wax build up. A full case study will follow. Look in Latest News for further developments.